One useful brief
Share your rooms, dimensions, style, use, delivery and installation expectations once instead of repeating them to every company.
EXPERT GUIDE
Furnish an Alanya apartment from abroad with verified measurements, written approvals, comparable quotations, coordinated delivery and documented handover.

DIRECT ANSWER
Yes. An apartment in Alanya can be furnished while the owner is abroad by coordinating the property brief, verified measurements, furniture choices, written approvals, supplier quotations, delivery, installation and final checks remotely. The process also needs a clear access arrangement and a named person or company responsible for each on-site step.
Combine the plan, verified measurements, current photos and video, use, style direction, budget scope, target date and access contact in one brief.
Record rooms, openings, sockets, air conditioning and building access together.
Include liked and disliked references, priorities and explicit exclusions.
State whether the target is furniture-only, basic use, rental-ready or fully move-in-ready, and list what is excluded.
Do not let separate teams use conflicting dimensions; identify the revision date and the person who verifies final measurements.
Flag curtains, bespoke work and delivery access that cannot rely on a plan alone.
Retire old files and record which approved version supports each order.
Approve layout scale, product code, colour, fabric, quantity and alternatives in writing; review samples in the apartment's daylight where possible.
A mood board sets direction; a measured layout confirms whether products fit.
If an approved item changes, review cost, timing and appearance before approving the replacement.
Compare the same product and service scope, and identify the payment party, contract, warranty, delivery and installation responsibility in writing.
Plan fitted work and electrical preparation, large furniture, curtains and lighting, rugs and accessories together with management rules and lift booking.
Request a room overview, close details, surfaces, door and drawer operation, textile fit, lighting tests and missing-item records.
Give every issue an owner, due date and completion evidence.
Do not mark the home complete while critical issues remain open.
Avoid ordering from unverified measurements, approving through scattered messages, paying before scope is clear and scheduling delivery without an access plan.
AlanyaPass helps clarify the brief, contact suitable local options and compare quotation scope. Sales, payment, final measurement, delivery and installation commitments are agreed with the selected company.
OUR PROJECTS
Real photographs of apartments, villas and offices furnished by our team. Explore furniture choices and layouts across the project galleries.
Frequently asked questions
The cost depends on the rooms, dimensions, quantities, materials and delivery or assembly work. AlanyaPass does not publish a fixed package price. Share a room list and spending range so local companies can prepare a request-specific offer; compare what each offer includes before choosing.
Yes. You can share plans, photos and preferences remotely. Before confirming an order, agree who will verify measurements, provide access to the home and check the delivery. AlanyaPass helps coordinate the request; delivery and installation commitments are confirmed with the selected company.
Send the property area, room list, floor plan or approximate measurements, preferred style, spending range and intended move-in date. Note existing furniture, missing items and any lift or stair restrictions. Final measurements should be confirmed before ordering size-sensitive pieces.
Do not assume they are. Ask for separate confirmation of transport, carrying items upstairs, assembly, wall fixing, packaging removal and any extra charges. Compare product dimensions, materials, quantities, timing and after-sales terms alongside the total price.
You can start planning with a floor plan and expected handover date. Mark estimated measurements clearly and confirm access, final dimensions and a delivery window before committing to an order. A planned handover date is not a guaranteed installation date.
AlanyaPass coordinates your brief and suitable local options. Final product selection, sales contract, payment, delivery and installation terms are agreed between you and the selected company. Submitting a request through AlanyaPass is free and does not oblige you to buy.
ALANYAPASS
Create one free request and let us match the brief with suitable local companies.